Am trying DWM in a digital format
Original Post
Hi Folks,
As much as I have liked using paper with my AF lists, and I am going to continue to use AF4 for my home front, I have decided to setup Outlook 2007 for DWM. My entire calendar is in there as my staff and program associates have access to it for scheduling meetings, so it makes sense to go ahead and use the tasks function. So far, I think it is working very well. I think my biggest problem I was having with DWM is that I just did not like the paper diary I was using and could not find one to my liking.
So let's see how this goes. When I did pure GTD, my entire system was digital, so this is not virgin territory for me.
Best regards,
-David
As much as I have liked using paper with my AF lists, and I am going to continue to use AF4 for my home front, I have decided to setup Outlook 2007 for DWM. My entire calendar is in there as my staff and program associates have access to it for scheduling meetings, so it makes sense to go ahead and use the tasks function. So far, I think it is working very well. I think my biggest problem I was having with DWM is that I just did not like the paper diary I was using and could not find one to my liking.
So let's see how this goes. When I did pure GTD, my entire system was digital, so this is not virgin territory for me.
Best regards,
-David
Reply by David Drake
Okay....had to run to a meeting and did not have my AF4 notebook with me. I forgot to print out my tasks from Outlook. Sigh....never mind....I am going back to AF4.
I too like to test things, tweak things, but to a point, I am being very counterproductive. I WAS AND AM happy with AF4 and I should just stay there and quite playing around with things.
Sorry for the ridiculous posts and rants on my part. I do think I need a vacation.
-David
I too like to test things, tweak things, but to a point, I am being very counterproductive. I WAS AND AM happy with AF4 and I should just stay there and quite playing around with things.
Sorry for the ridiculous posts and rants on my part. I do think I need a vacation.
-David
Reply by Brian
Speaking from experience, and suffering from similar "systems addiction," it's amazing how much you can get done when you just pick one and start doing those things that make your world go round.
Reply by Silvia
David,
I always read your posts and see how much you are trying to give DWM a chance. I also have a similar impulse. Trying to make GTD work for me was a good experience, I did lost a lot of time. I am so happy with AF4. I read once more the answers to the poll you made, and I find some tips I will try to use, like this one from Sairey "My current rule is that when I start writing on the 8th page, the oldest active page is dismissed." Anyway, I appreciated your posts and by no means think they are ridiculous.
I always read your posts and see how much you are trying to give DWM a chance. I also have a similar impulse. Trying to make GTD work for me was a good experience, I did lost a lot of time. I am so happy with AF4. I read once more the answers to the poll you made, and I find some tips I will try to use, like this one from Sairey "My current rule is that when I start writing on the 8th page, the oldest active page is dismissed." Anyway, I appreciated your posts and by no means think they are ridiculous.
Reply by David Drake
Hi Silvia,
Thanks -- that was very gracious of you and I appreciate the very kind remarks. I have tried very hard to like DWM, but it is not to be for me. I am staying with AF4, which I think is fantastic. Now, back to work for me....
-David
Thanks -- that was very gracious of you and I appreciate the very kind remarks. I have tried very hard to like DWM, but it is not to be for me. I am staying with AF4, which I think is fantastic. Now, back to work for me....
-David
Reply by Roger J
David D,
'Nice' to see another person to-ing and fro-ing ;-)
I've stopped worrying about my transition efforts being a reflection of a desire to have the Perfect Solution, although I think that might be a contributor to my innate procrastination tendency.
In the heady days of AF1, and since then, Mark and his various apostles have often emphasised that individual tweaks are ok, as long as such tweaks work for the tweaker.
I am finding DWM for me in ListPro has enough scope to deploy AF4 for me where I can.
Outlook 2007: I also use this, but found the way the tasks pop up and present themselves according to rules (eg Michael Linenberger's Total Workday Control) did not motivate me enough. I was always wondering about the hidden/deferred/reminder tasks lurking somewhere, even though can have a view showing all tasks sorted every which way, but loose.
I really like DWM with ListPro, using a Closed List for today (with/without a Current Initiative) and having all the tasks shown in date order a la a diary. Others have mentioned the 'forward' looking aspect of DWM as opposed to other incarnations which highlight backlogs and I agree with some others that DWM is the current best approach for harnessing DIT and AF(4).
BUT I still use Outlook for hard due dates and meetings, travel, plus setting aside blocks to work on project and other bigger tasks.
A luta continua, the struggle continues.
Roger J
'Nice' to see another person to-ing and fro-ing ;-)
I've stopped worrying about my transition efforts being a reflection of a desire to have the Perfect Solution, although I think that might be a contributor to my innate procrastination tendency.
In the heady days of AF1, and since then, Mark and his various apostles have often emphasised that individual tweaks are ok, as long as such tweaks work for the tweaker.
I am finding DWM for me in ListPro has enough scope to deploy AF4 for me where I can.
Outlook 2007: I also use this, but found the way the tasks pop up and present themselves according to rules (eg Michael Linenberger's Total Workday Control) did not motivate me enough. I was always wondering about the hidden/deferred/reminder tasks lurking somewhere, even though can have a view showing all tasks sorted every which way, but loose.
I really like DWM with ListPro, using a Closed List for today (with/without a Current Initiative) and having all the tasks shown in date order a la a diary. Others have mentioned the 'forward' looking aspect of DWM as opposed to other incarnations which highlight backlogs and I agree with some others that DWM is the current best approach for harnessing DIT and AF(4).
BUT I still use Outlook for hard due dates and meetings, travel, plus setting aside blocks to work on project and other bigger tasks.
A luta continua, the struggle continues.
Roger J
Reply by Gerry
I think that it is fine to try new things, but we need to be aware that time management systems are like an investment. They require an investment of time to learn before they pay dividends in time saved. They also require an ongoing investment of time to maintain. It is sometimes hard to quantify the return on the investment. In theory if you spent no time on time management, 100% of your time would be available to actually do things. However, for me, without some system in place, I would forget things and it would reduce my effectiveness and cost me time. So I look for the simplest way to make sure I don't forget things. Obviously everyone has their issues and should make sure their system addresses them.
Additionally, as Mark has mentioned, if you are over committed no time management will solve this.
I appreciate the laboratory like quality of this forum since it is with experiment that we will all find what works for us.
Gerry
http://www.simple-time-management.com
Additionally, as Mark has mentioned, if you are over committed no time management will solve this.
I appreciate the laboratory like quality of this forum since it is with experiment that we will all find what works for us.
Gerry
http://www.simple-time-management.com
Reply by Seraphim
Gerry -
<<>>
Actually I am expecting DWM to help me do just that. It's been hard for me to see where all the overcommitment is, and where all the tasks are coming from. DIT was good for identifying those things, to some degree, but failed (for me) because of its inflexibility. DWM addresses that issue, and is helping clarify the areas of overcommitment more effectively than AFx did. Re-reading DIT probably helped too.
Regarding the overhead / ROI of ramping up on a new time-mgmt system -- I have really liked AF and DWM because that ramp is so minimal, and the ongoing overhead is negligible. (Unlike GTD, Franklin Covey, and so many others, at least for me.) In fact I'd be happy to switch to almost anything Mark comes up with, since there is always a productivity boost just because of the novelty of the thing.
Maybe that is Mark's meta-system behind all the experimentation with new TM systems -- keep experimenting, and with each new iteration you'll get a productivity boost, in addition to whatever else is learned along the way.
<<
Actually I am expecting DWM to help me do just that. It's been hard for me to see where all the overcommitment is, and where all the tasks are coming from. DIT was good for identifying those things, to some degree, but failed (for me) because of its inflexibility. DWM addresses that issue, and is helping clarify the areas of overcommitment more effectively than AFx did. Re-reading DIT probably helped too.
Regarding the overhead / ROI of ramping up on a new time-mgmt system -- I have really liked AF and DWM because that ramp is so minimal, and the ongoing overhead is negligible. (Unlike GTD, Franklin Covey, and so many others, at least for me.) In fact I'd be happy to switch to almost anything Mark comes up with, since there is always a productivity boost just because of the novelty of the thing.
Maybe that is Mark's meta-system behind all the experimentation with new TM systems -- keep experimenting, and with each new iteration you'll get a productivity boost, in addition to whatever else is learned along the way.
Reply by Gerry
Seraphim,
Interesting thought. Are you self employed? For me work is the huge "time block" in my life and all else get the leftovers. I am trying to find the ways to improve efficiency to free up time for other things, but unfortunately there is still a certain amount of face time employees must do.
Regarding ROI, I agree the common theme with all of Mark's systems is simplicity which allows for a quick ramp up. I never got the two years to GTD blackbelt idea. It seems like too much to ask. When I read the GTD forum occasionally, it still seems like people are having struggles, tweaking and still trying to sort out systems. I think some of it is due to the complexity.
There seems to be more innovation going on here and a breadth of ideas. Other systems are more rigid. It would be hard to calculate, but I am sure there are lots of people using systems which actually are a net negative to their productivity.
Gerry
Interesting thought. Are you self employed? For me work is the huge "time block" in my life and all else get the leftovers. I am trying to find the ways to improve efficiency to free up time for other things, but unfortunately there is still a certain amount of face time employees must do.
Regarding ROI, I agree the common theme with all of Mark's systems is simplicity which allows for a quick ramp up. I never got the two years to GTD blackbelt idea. It seems like too much to ask. When I read the GTD forum occasionally, it still seems like people are having struggles, tweaking and still trying to sort out systems. I think some of it is due to the complexity.
There seems to be more innovation going on here and a breadth of ideas. Other systems are more rigid. It would be hard to calculate, but I am sure there are lots of people using systems which actually are a net negative to their productivity.
Gerry
Reply by Alan Baljeu
Gtd was net-negative for me while it lasted,
on account of I spent much time over some months mastering the implementation, and never actually arriving. Problems included not satisfactorily grasping the Organize phase and how it fits with Process; staying consistent with Collect and Do; and consistently neglecting the weekly Review.
In short, Everything was problematic! I think Allen's focus is on the mark but the implementation/system is a hopeless mess. I still very much like reading Ready For Anything, only every time he gets to a specific practice I sub in one of Mark's suggestions because those actually work.
on account of I spent much time over some months mastering the implementation, and never actually arriving. Problems included not satisfactorily grasping the Organize phase and how it fits with Process; staying consistent with Collect and Do; and consistently neglecting the weekly Review.
In short, Everything was problematic! I think Allen's focus is on the mark but the implementation/system is a hopeless mess. I still very much like reading Ready For Anything, only every time he gets to a specific practice I sub in one of Mark's suggestions because those actually work.
Reply by Seraphim
Gerry -
<<>>
No, I work a regular full-time job. Generally I have a good idea of how to manage that workload and to be effective there. I don't feel overcommitted (or undercommitted) at work. Yes, it's the big time block in my life, too.
The problem is, I have lots of other important things to which I try to attend in the remaining bits of time -- six children (that would be enough said right there); church life; tech support and marketing for my self-employed wife and daughter; goats and chickens and garden (though the kids have taken over most of that); local political activism; and constantly dealing with health issues. Not to mention participating in the ongoing philosophical debates over on Mike's list in my "spare moments". ;-)
AF (and DIT and DWM) have all helped me to prune some other commitments which I've already dropped from the list, but the remainder is still too much, especially when the health issues flare up. DIT/DWM have already helped me see where some of the problems are. I'm hoping as the first 30 days start to roll over, it will increase that focus even more.
<<
No, I work a regular full-time job. Generally I have a good idea of how to manage that workload and to be effective there. I don't feel overcommitted (or undercommitted) at work. Yes, it's the big time block in my life, too.
The problem is, I have lots of other important things to which I try to attend in the remaining bits of time -- six children (that would be enough said right there); church life; tech support and marketing for my self-employed wife and daughter; goats and chickens and garden (though the kids have taken over most of that); local political activism; and constantly dealing with health issues. Not to mention participating in the ongoing philosophical debates over on Mike's list in my "spare moments". ;-)
AF (and DIT and DWM) have all helped me to prune some other commitments which I've already dropped from the list, but the remainder is still too much, especially when the health issues flare up. DIT/DWM have already helped me see where some of the problems are. I'm hoping as the first 30 days start to roll over, it will increase that focus even more.
Reply by Will
Roger,
You can use the Outlook task list as a perfectly functional daily task diary, as Brian and I have found. I used to have tremendous fun playing with the system and tying myself in incredible knots. But now I take a simple pleasure in a simple, robust list.
Filtered for incomplete tasks due in the future, grouped by due date, sorted within due date by date created, with the current task in large, bold, green text and "next pass" tasks in large, bold, red.
Naturally.
:o)
You can use the Outlook task list as a perfectly functional daily task diary, as Brian and I have found. I used to have tremendous fun playing with the system and tying myself in incredible knots. But now I take a simple pleasure in a simple, robust list.
Filtered for incomplete tasks due in the future, grouped by due date, sorted within due date by date created, with the current task in large, bold, green text and "next pass" tasks in large, bold, red.
Naturally.
:o)
Reply by Roger J
Will,
Aaaargh! I knew this would happen, someone would have found a good way to way to embed DWM within Outlook and end up with a simple ROBUST list.
Would you mind dropping me an email at rhj1947ATgmail.com and I'll send you my usual email address? Do you manage DWM TOTALLY on-screen or do you prin tout a full list of all tasks not completed or even started?
Regards,
Roger J
Aaaargh! I knew this would happen, someone would have found a good way to way to embed DWM within Outlook and end up with a simple ROBUST list.
Would you mind dropping me an email at rhj1947ATgmail.com and I'll send you my usual email address? Do you manage DWM TOTALLY on-screen or do you prin tout a full list of all tasks not completed or even started?
Regards,
Roger J
Reply by Seraphim
Will -
<<>>
Are you using Outlook 2007?
How do you toggle the "current task"? (what field do you use to indicate that it's the current task, which then triggers the bold green formatting?)
How do you toggle the "next pass" tasks? (what field do you use to flag that they are "next pass" tasks)
I spend a lot of time in Outlook and would like to see if I can make it work as a DWM list. But it's rather awkward since IT imposes retention limits on the In Box (.OST) folders, but flagged items in the personal (.PST) folders don't show up on the Task Bar / Task List.
This always seems to push me toward two lists -- one for Outlook tasks, OneNote tasks, and flagged emails in the .OST file; and another one for flagged emails in the .PST files. But DWM doesn't work so great with two separate lists -- they need to be integrated into ONE list.
I'm trying to see if I can put all one-off tasks in the .OST, and project-only tasks in the .PST. That way, I can have tasks in the .OST that say "go review the project folder in the PST". But I still keep running into the retention policies in the OST. If I keep anything for 35 days it gets automatically deleted. And if I go over 225 MB it shuts down altogether.
Any ideas?
<<
Are you using Outlook 2007?
How do you toggle the "current task"? (what field do you use to indicate that it's the current task, which then triggers the bold green formatting?)
How do you toggle the "next pass" tasks? (what field do you use to flag that they are "next pass" tasks)
I spend a lot of time in Outlook and would like to see if I can make it work as a DWM list. But it's rather awkward since IT imposes retention limits on the In Box (.OST) folders, but flagged items in the personal (.PST) folders don't show up on the Task Bar / Task List.
This always seems to push me toward two lists -- one for Outlook tasks, OneNote tasks, and flagged emails in the .OST file; and another one for flagged emails in the .PST files. But DWM doesn't work so great with two separate lists -- they need to be integrated into ONE list.
I'm trying to see if I can put all one-off tasks in the .OST, and project-only tasks in the .PST. That way, I can have tasks in the .OST that say "go review the project folder in the PST". But I still keep running into the retention policies in the OST. If I keep anything for 35 days it gets automatically deleted. And if I go over 225 MB it shuts down altogether.
Any ideas?
Reply by Will
Seraphim,
Yes, I'm using Outlook 2007.
I added a couple of user defined logical fields for "doing" and "next pass". These show up as checkboxes.
I use a separate window for tasks, rather than the taskbar. (I've been doing this for a while...)
Here's a picture, from before the "next pass" http://screencast.com/t/MDEwMmM3Y .
We don't suffer from time limits. do these run from date created or date modified? If date created then I'd enter repeat tasks anew rather than simply overtyping "w" over the due date. The downside is that I wouldn't get to keep notes and attachments that I,d dragged from mail. But If I copied the title, I could still search for them in the .pst.
Alternatively, you ought to be able to set up a tasks folder in a pst..
I use two lists: one in tasks and a list of flagged sent mails for follow up. I don't get to the latter as often as I should. (So I agree that one list is really best.) I drag and drop received mails from inbox to task list rather than using the flags.
Roger,
I'll mail later today.
Yes, I'm using Outlook 2007.
I added a couple of user defined logical fields for "doing" and "next pass". These show up as checkboxes.
I use a separate window for tasks, rather than the taskbar. (I've been doing this for a while...)
Here's a picture, from before the "next pass" http://screencast.com/t/MDEwMmM3Y .
We don't suffer from time limits. do these run from date created or date modified? If date created then I'd enter repeat tasks anew rather than simply overtyping "w" over the due date. The downside is that I wouldn't get to keep notes and attachments that I,d dragged from mail. But If I copied the title, I could still search for them in the .pst.
Alternatively, you ought to be able to set up a tasks folder in a pst..
I use two lists: one in tasks and a list of flagged sent mails for follow up. I don't get to the latter as often as I should. (So I agree that one list is really best.) I drag and drop received mails from inbox to task list rather than using the flags.
Roger,
I'll mail later today.
Reply by Brian
Seraphim,
Check your PST file by right-clicking the PST name (e.g. Personal Folders) in the Folders list, selecting "Properties" and verifying that the "Display reminders and tasks from this folder in the To-Do Bar " checkbox is enabled. Don't do this on the Tasks folder in the PST, but the top-level PST. Does it help?
Check your PST file by right-clicking the PST name (e.g. Personal Folders) in the Folders list, selecting "Properties" and verifying that the "Display reminders and tasks from this folder in the To-Do Bar " checkbox is enabled. Don't do this on the Tasks folder in the PST, but the top-level PST. Does it help?
Reply by Seraphim
Will -
<>
Thanks! That explains it -- and thanks also for the screenshot. Looks great. I will give it a try.
<>
Date modified. But actually I think Brian's tip will resolve this issue for me. I can keep using my PSTs! Hurray!
Thanks for the tips!
<>
Thanks! That explains it -- and thanks also for the screenshot. Looks great. I will give it a try.
<
Date modified. But actually I think Brian's tip will resolve this issue for me. I can keep using my PSTs! Hurray!
Thanks for the tips!
Reply by Seraphim
Brian -
<>
I had no idea that option was available! Thanks very much! This has been plaguing me for months -- I am so glad you pointed this out. It works great!!
Thanks again!
<
I had no idea that option was available! Thanks very much! This has been plaguing me for months -- I am so glad you pointed this out. It works great!!
Thanks again!
Reply by Seraphim
After a year of doing AF and descendants in a paper notebook, I am going to give this a try in Outlook. Brian and Will have given me enough information to make this work, I think. It's a little frightening -- I like the tactile part of writing things down -- it makes things seem more "real" or "grounded" or something. But I do spend so much time in Outlook that I think it makes sense to give it a try.
Thanks again Brian and Will for your help!
Thanks again Brian and Will for your help!
Reply by Alan Baljeu
I've been happy for a while with MS OneNote. But now that I have an iPhone, I'm looking for a product that does Windows and the iPhone, or that does desktop and/or iPhone web interfaces.
The required solution MUST have notes linked to tasks, and must have "projects" or lists of tasks. And be able to support a no-fuss DWM implementation. ListPro and OmniFocus sound like they would be nice, but they don't do both iPhone and Windows.
Suggestions?
The required solution MUST have notes linked to tasks, and must have "projects" or lists of tasks. And be able to support a no-fuss DWM implementation. ListPro and OmniFocus sound like they would be nice, but they don't do both iPhone and Windows.
Suggestions?
Reply by Mike
I've posted at length on my implementation of Toodledo.
- It has a web site
- It has an iphone app ($4, I think)
- It has an iPhone friendly web site
- It has a FireFox extension for quick access.
- It integrates with other iPhone products (like Pocket Informant)
- It exports to and imports from Excel and any other product that reads CSV
- It allows notes
- The paid version (subscription) allows attached files
- It has contexts
- It has Folders (which I use as projects to hold related tasks)
- It has one click due date changing (1 Day, 1 Week, 1 Month among other quick entries as well as a calendar date selection.)
- It has an active user forum and the developer is very responsive.
The one big negative is that the web interface is overly complex and confusing. They really need to hire a web interface designer ;-)
- It has a web site
- It has an iphone app ($4, I think)
- It has an iPhone friendly web site
- It has a FireFox extension for quick access.
- It integrates with other iPhone products (like Pocket Informant)
- It exports to and imports from Excel and any other product that reads CSV
- It allows notes
- The paid version (subscription) allows attached files
- It has contexts
- It has Folders (which I use as projects to hold related tasks)
- It has one click due date changing (1 Day, 1 Week, 1 Month among other quick entries as well as a calendar date selection.)
- It has an active user forum and the developer is very responsive.
The one big negative is that the web interface is overly complex and confusing. They really need to hire a web interface designer ;-)
Reply by Roger J
Alan:
As you know, I use ListPro for Windows and Windows Mobile/Phone, have done for several years. It is working well for me for DWM, with tasks and sub-tasks which lend themselves to projects and include notes linked to every task. It's no MS Project competitor, but suitable for the type of person I reckon is attracted to the forum - individuals who are prepared to be mavericks to improve their own and their organisation's productivity.
I've just looked at the developer's site, www.ilium.com and was surprised to see that while eWallet (another application I use often) and a few others are available for the iPhone, ListPro isn't.
Perhaps you might drop the developer an email, in case ListPro is a work-in-progress for the iPhone.
As you know, I use ListPro for Windows and Windows Mobile/Phone, have done for several years. It is working well for me for DWM, with tasks and sub-tasks which lend themselves to projects and include notes linked to every task. It's no MS Project competitor, but suitable for the type of person I reckon is attracted to the forum - individuals who are prepared to be mavericks to improve their own and their organisation's productivity.
I've just looked at the developer's site, www.ilium.com and was surprised to see that while eWallet (another application I use often) and a few others are available for the iPhone, ListPro isn't.
Perhaps you might drop the developer an email, in case ListPro is a work-in-progress for the iPhone.
Reply by Andreas Hofmann
ListPro for iPhone has been a topic for a while. Ilium Software has announced that they are working on a ListPro Reader, but they don't have plans for a full featured iPhone client.
The announcement is here: http://blog.iliumsoft.com/2008/12/04/listpro-for-iphone-update/
As you can see, that was in 2008. There was a small update in this post from October 2009: http://blog.iliumsoft.com/2009/10/20/development-update/
We'll see if and when they release something.
The announcement is here: http://blog.iliumsoft.com/2008/12/04/listpro-for-iphone-update/
As you can see, that was in 2008. There was a small update in this post from October 2009: http://blog.iliumsoft.com/2009/10/20/development-update/
We'll see if and when they release something.
Reply by Will
And the pay version of Toodledo has hierarchical tasks.
I don't think there's a way to see the individual days advancing on you, though: just the general mass of
- Next Month: "There's a lot of 'em massing out there, sah!"
- Next Seven Days: "Steady, men: aimed shots"
- Tomorrow: "Fire at Will" (I HATE that!)
- Today: "Oops: did I forget to say "Fix Bayonets?""
And I don't think the iPhone App can do a context filter on the date view.
I like it a lot, but without a clean, reliable sync to Outlook Tasks, I won't use it for work.
I don't think there's a way to see the individual days advancing on you, though: just the general mass of
- Next Month: "There's a lot of 'em massing out there, sah!"
- Next Seven Days: "Steady, men: aimed shots"
- Tomorrow: "Fire at Will" (I HATE that!)
- Today: "Oops: did I forget to say "Fix Bayonets?""
And I don't think the iPhone App can do a context filter on the date view.
I like it a lot, but without a clean, reliable sync to Outlook Tasks, I won't use it for work.
Reply by Mike
No, you are right about the display. But all the tasks due next week are in order as one long page so it is about the same thing ... to me at least. I'm not sure if some custom search might fix it to make it as you like. I've not messed with it enough.
Reply by Alan Baljeu
Calendar view gives you a count on each page. I think that will serve the purpose.
Reply by kneitinga
I did the following trick to get some visual context of the next 7 days and 4 weeks for my digital implementation.
For the upcoming next 7 days add "-" as a daily delimiter with the respective due date set. If you use DWM in the office and don't want to use Sa/So only add the delimiter for the next 5 workdays. To get the delimters sorted in after all the real tasks of the respective day set the priority to "-1 Negative" if you use Toodledo (sort by due date, priority). If you use MLO set the time part in the due date to 11:58 pm instead.
For the upcoming next 4 weeks add ".========== week ============" as a weekly delimiter with the due date set at the end of the respective week. In the office Friday is my end of the week. At home I set it to Sunday.
Again, to get the weekly delimters sorted in after all the real tasks of the respective week set the priority to "-1 Negative" if you use Toodledo. If you use MLO set the time part in the due date to 11:59 pm instead (1 Min. more than the daily delimiters).
When today is over just forward the due date of todays "-" by one week so it helps to divide the updcoming week. Thus with each passed weekday you get one more delimiter visible in next weeks time frame. If the week is over forward the due date of this week's delimiter by one month.
Pros:
+ You get a pretty good visual representation of the due tasks during each of the next 7 days and during the next 4 weeks.
+ You see days or maybe even a week where no task are due (this is a real fine feeling).
Cons:
- Your number of tasks is not really correct any longer, as the delimiters are counted as tasks as well.
For the upcoming next 7 days add "-" as a daily delimiter with the respective due date set. If you use DWM in the office and don't want to use Sa/So only add the delimiter for the next 5 workdays. To get the delimters sorted in after all the real tasks of the respective day set the priority to "-1 Negative" if you use Toodledo (sort by due date, priority). If you use MLO set the time part in the due date to 11:58 pm instead.
For the upcoming next 4 weeks add ".========== week ============" as a weekly delimiter with the due date set at the end of the respective week. In the office Friday is my end of the week. At home I set it to Sunday.
Again, to get the weekly delimters sorted in after all the real tasks of the respective week set the priority to "-1 Negative" if you use Toodledo. If you use MLO set the time part in the due date to 11:59 pm instead (1 Min. more than the daily delimiters).
When today is over just forward the due date of todays "-" by one week so it helps to divide the updcoming week. Thus with each passed weekday you get one more delimiter visible in next weeks time frame. If the week is over forward the due date of this week's delimiter by one month.
Pros:
+ You get a pretty good visual representation of the due tasks during each of the next 7 days and during the next 4 weeks.
+ You see days or maybe even a week where no task are due (this is a real fine feeling).
Cons:
- Your number of tasks is not really correct any longer, as the delimiters are counted as tasks as well.
Reply by Roger J
Kneitinga,
I do something similar in ListPro by using colour shading (Four + None, which stops overload from too many colours):
Routine (Daily, Weekly, Monthly): Green
Closed List/Today: Yellow ie for NON-Routine tasks
1 - 7 days: Purple
8 - 28: None
To delineate the Closed List, I use a text only/no date in Blue
This arrangement is working as I see the "looming" Purple and tackle them to minimise the fear factor (see Alan B's thread).
I do something similar in ListPro by using colour shading (Four + None, which stops overload from too many colours):
Routine (Daily, Weekly, Monthly): Green
Closed List/Today: Yellow ie for NON-Routine tasks
1 - 7 days: Purple
8 - 28: None
To delineate the Closed List, I use a text only/no date in Blue
This arrangement is working as I see the "looming" Purple and tackle them to minimise the fear factor (see Alan B's thread).
Reply by acedia
Will:
If you are using Toodledo and want to see all your tasks listed day by day, for the coming month, as you would in a page-a-day diary, try using the calendar view. Each date on the calendar shows the number of tasks due that day. When you click on a date, a list of those tasks appears below the calendar. This way you can view your tasks as a series of closed lists, just as though you were using paper.
Unfortunately, I don't think the calendar view is available on the iPhone - although I don't know for sure, as I don't have one myself.
HTH
If you are using Toodledo and want to see all your tasks listed day by day, for the coming month, as you would in a page-a-day diary, try using the calendar view. Each date on the calendar shows the number of tasks due that day. When you click on a date, a list of those tasks appears below the calendar. This way you can view your tasks as a series of closed lists, just as though you were using paper.
Unfortunately, I don't think the calendar view is available on the iPhone - although I don't know for sure, as I don't have one myself.
HTH
Reply by Alan Baljeu
I downloaded Pocket Informant Lite, an iPhone app that syncs to the Toodledo website. This one seems awesome. It has a configurable display for todos. The mode I like shows in a single sectioned list these sections: Due Today, Due Tomorrow, Due within a week and Due within a month.
You can also go to calendar view, (which isn't good for entering todo's; it's for appointments and meetings) that can give you an overview of tasks and counts, if configured that way.
I haven't put my stuff in yet, but I think I will. You need the full version to actually work this.
You can also go to calendar view, (which isn't good for entering todo's; it's for appointments and meetings) that can give you an overview of tasks and counts, if configured that way.
I haven't put my stuff in yet, but I think I will. You need the full version to actually work this.
Reply by Nicole
I've just resurrected my old Palm TX because I thought DWM might play well with the built-in task-application. It does, so I'm back to digital (after a year of happily working on paper). We'll see how long that lasts...
Reply by acedia
Something I forgot to mention is that the calendar view in Toodledo (desktop) is that it also shows how many tasks have been completed each day, which is a nice easy way to get a sense of achievement.
It's true, it is limited compared to the other views available in TD, but this can be an advantage too - my main problem with digital methods is that I spend too much time playing with the options - in calendar view there just aren't many to play with!
It really depends whether you work better with one long list or a series of closed lists - DWM seems to have both aspects inbuilt, so it comes down to personal preference - TD is versatile enough to work either way.
It's true, it is limited compared to the other views available in TD, but this can be an advantage too - my main problem with digital methods is that I spend too much time playing with the options - in calendar view there just aren't many to play with!
It really depends whether you work better with one long list or a series of closed lists - DWM seems to have both aspects inbuilt, so it comes down to personal preference - TD is versatile enough to work either way.